933 Prosperity Drive, Birtinya, QLD 4575

933 Prosperity Drive, Birtinya, QLD 4575
From $470,000

  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 933 Prosperity Drive, Birtinya
  • 2Bedrooms
  • 2Bathrooms
  • 1Garages

Luxurious 2 bedroom Waterfront Apartment with Media Room - Perfect for Living or Investing

Looking for a luxury apartment with northerly water views from a private balcony?

Thinking of a spacious and airy apartment with luxury fit outs? Well everything you’ll want and need is right here.

Curve Birtinya is ideally situated at the heart of Oceanside Health Hub (a 17-hectare development adjacent to the Sunshine Coast Health Precinct) and within strolling distance to the newly opened $1.8 billion Sunshine Coast University Hospital and University Private Hospital. With Stockland Birtinya soon to be on your doorstep you’ll have easy access to Coles, Aldi and 110 specialty stores along with several dining options.

Featuring:

- Generous sized 2 bedroom apartments with media room / study
- Luxurious fittings and fixtures throughout
- Kitchen features quality Miele appliances and reconstituted stone benchtops
- Fully tiled bathrooms
- Separate laundry
- Reverse cycle airconditioning
- Ceiling fans in living and bedrooms
- Recessed LED lighting
- Generous sized balconies with water views
- Secure underground car parking

Apart from its idyllic waterfront position and proximity to this unique greenfield health and medical infrastructure, Curve Birtinya residents will also have the Kawana Town Centre, including a large retail development, right on their doorstep.

The developer is offering free stamp duty for a limited time - get in early to take advantage of this opportunity.

Completion date for the apartments is scheduled for late 2020.

  • Air Conditioning
  • Reverse Cycle Air Conditioning


What is ?